Skip to main content
LIVE CONTEST: ALGOR Contest: Round #4 (Special Challenge) is live now!

~/algor $ cat problems/dp-loyihalar-foydasi

Maximum profit from projects

Medium 1000 ms 128 MB 56%
Share

$n$ projects are offered: the $i$-th project lasts from day $s_{i}$ to day $e_{i}$ (both inclusive) and brings $p_{i}$ soums of profit. Only one project can be worked on per day, and a started project is carried out to the end. Which projects should be taken to make the total profit as large as possible? Print this profit.

Project segments on a time axis: the set of non-overlapping projects with the largest profit is highlighted

Input

The first line contains a positive integer $n$. Each of the next $n$ lines contains three positive integers: $s_{i}$, $e_{i}$, $p_{i}$.

Output

One integer — the largest total profit.

Note

$1 \le n \le 10^{5}$
$1 \le s_{i} \le e_{i} \le 10^{9}$
$1 \le p_{i} \le 10^{9}$

Examples

Input #1
4
1 3 5
2 5 6
4 6 5
7 8 3
Output #1
13
Input #2
2
1 5 4
5 9 4
Output #2
4

Sign in to submit a solution

Signing up is free and takes a minute.